Musk Plans Texas Solar Factory Bigger Than America’s Entire Current Capacity
KEY POINTS
- •Tesla filed for a $10.1 billion solar factory, Project Crystal Sun, slated to start operations in early 2029 in Fort Bend County, Texas.
- •Elon Musk said both Tesla and SpaceX aim to independently produce 100 GW per year of US solar manufacturing by around 2029.
- •Tesla is pursuing state and local tax incentives to begin construction this year, emphasizing the factory’s critical role in solar and semiconductor manufacturing.
Elon Musk reportedly greenlit a $10.1 billion solar behemoth called Project Crystal Sun in Texas, set to employ 9,700+ people by 2029—just in time to remind us robots need sunburn protection. According to Musk’s January World Economic Forum flex, Tesla and SpaceX each plan to pump out 100 GW of solar annually, easily eclipsing the US’s entire 74.1 GW solar manufacturing output. Musk encourages copycats as if mass-manufactured sunshine is now a competitive sport. Tesla’s secretive tax-incentive pitch also hints the factory will massacre photovoltaics and assemble solar modules like a Lego fiend on a caffeine high. Construction kicks off this year if Texas pony-ups, completing a solar empire that sounds less like energy and more like Musk’s cosmic cosplay of the sun itself.
Share the Story
(1 of 3)Source: Businessinsider | Published: 8/13/2026 | Author: Lloyd Lee